So the opportunity was grabbed to refresh the public buffet during the enforced closure. A terrific team effort resulted in the transformation shown here.
A forum post written by Patrick http://forum.svra.org.uk/posting.php?mode=quote&p=31306&sid=5bcbf46ee8a94e01962381a910558834 describes the process, started on Saturday with the bulk of the repainting, and completed on Sunday with remainder of painting, followed by lots and lots of cleaning, and returning the furnishings.
Just as well the Forth Bridge doesn't apparently need painting quite so often.
ReplyDelete